Construction of first application of RUCONBAR has started on May 19th 2014 on a road D102 near Krk bridge tool station.
First RUCONBAR noise protection wall to be constructed is “Wall 5” stretching 48 m in length and 3 m in height.
Construction started with drilling of piles for foundations.
After the pile testing the foundation blocks have been casted and base plates fitted.
Final appearance of “Wall 5” is available below: